

Photos, a condition report and a fixed written price.

Most commercial buildings in the Valley have flat or low slope roofs crowded with HVAC units, ductwork, conduit and skylights. Every one of those is a penetration, and penetrations are where commercial roofs leak.
Spray foam and fluid applied coatings seal around all of it as one continuous surface, go on over the existing roof without opening the deck, and cut the heat load on rooftop units through the summer.
Commercial roofs rarely fail all at once. Some problems need a crew this week; others belong in next year’s budget. We tell you which is which, in writing.
These put stock, equipment or tenants at risk.
We can schedule it around your quiet months.
Commercial work is planned around what happens under the roof: tenants, stock, customers and opening hours. Here is how we keep it predictable.

We walk the whole roof, photograph every issue and give you a written condition report with options and prices.
Sections, start times and weekend work are scheduled around your busiest hours, in writing, before work begins.
Drains, seams, curbs and penetrations are repaired and reinforced first, because that is where commercial roofs fail.
The foam or coating goes on in sections with nothing left open overnight, and you get photos and the warranty at handover.
From a single leaking unit over a restaurant kitchen to a full warehouse roof, with the building kept open throughout.
Seamless, insulating foam systems sprayed over the existing roof.
Tough, fast curing membranes for roofs with heavy service traffic.
Spring and fall inspections with a short written report and photos.
After hours leak? A crew makes it watertight that night and returns for the permanent fix.
Most commercial roof failures we are called to were preventable. These are the habits that stop them happening.
On most commercial buildings a sound roof can be restored from above for far less disruption than a tear off.
The roof is repaired where needed, then foam or a fluid applied coating goes on from above in sections. The building stays open, nothing goes to landfill, and future upkeep is a recoat rather than a replacement.
Needed when the deck has failed or the roof is saturated. It means more cost, more noise and areas of the building exposed while the work is done, so we only recommend it when restoration cannot work.
Restoration work is backed in writing, with photos and a report at handover.

What makes commercial roofing different is not the roof, it is everything under it: stock, tenants, customers, servers, a kitchen that opens at six. We plan the job around that, use systems that let the building stay open, and put the schedule in writing. The Gordons have worked on Scottsdale commercial roofs for over 18 years.
Flat and low slope commercial roofs across Scottsdale, from a single suite to a whole center.
Outside Scottsdale, we work on commercial roofs in Phoenix, Paradise Valley, Fountain Hills, Cave Creek, Carefree, New River, Tempe, Mesa, Chandler, Gilbert, Glendale, Peoria and Sun City. Every town we cover is listed on our service areas page.


Look us up with the BBB, where we are accredited, and on Angie’s List, where we won Super Service Awards in 2013 and 2014.
What Scottsdale building owners and property managers ask most before a commercial roof project.
Call and tell us about your portfolio. We can set up inspections across your properties and report on each roof.
Almost never. Foam and coating systems go on from above over the existing roof, in sections, so the deck is not opened and nothing is left exposed overnight. Work directly over sensitive areas can be scheduled for after hours.
On most buildings here it is spray foam with a protective coating, or a coating alone where the existing roof is still sound. Foam adds insulation and seals around rooftop equipment; the coating takes the UV and is renewed every 10 to 15 years.
Yes. Early starts, weekend work and staged sections are routine for us. Tell us when the building is busiest and we build the schedule around it, then put it in writing with the quote.
That describes most of the commercial roofs we work on. Every unit, duct and conduit is a penetration, and foam and coating systems seal around them as one surface instead of relying on dozens of separate flashings.
Twice a year in Arizona: before monsoon season and after it, plus after any major storm. Most problems found on those visits are blocked drains or lifting seams, which cost very little to fix early.
It depends on the square footage, the system, how much repair comes first and how much equipment has to be worked around. We survey the roof, photograph it and send a written condition report with a fixed price, at no cost.
Typically 10 to 15 years before the next recoat, longer with good drainage and regular inspections. Because a recoat goes over the existing system, the roof itself can keep going for decades without a tear off.
Yes. Every survey comes with photos and a written condition report, and every completed job comes with photos of the work and the warranty paperwork, which owners, lenders and insurers often ask for.
A bright, reflective coating sends much of the sun back off the roof instead of letting the deck soak it up, and foam adds insulation on top of the deck. Together they take load off rooftop units through a Scottsdale summer.
Call (602) 791-6415 or book a free roof survey. You get photos, a written condition report and a fixed price, with the work planned around your business.